All projects
Exteriors
Front of house, Bouldin
Brick repairs, a new front door and a planted path gave a tired house front real kerb appeal.
Location
Bouldin Creek, Austin
Timeline
5 weeks
Budget
$18,900
Finished
2025

The brief
Crumbling mortar, a draughty front door and a path that flooded every storm.
What we did
We repointed the brickwork, fitted an insulated blue front door, relaid the path with proper drainage and planted the front beds.
In their words
The neighbours stop to ask who did our door. That says it all.
Grace and Omar Haddad
Materials and finishes
Cabinetry
Hand-painted shaker, cobalt
Worktop
Honed limestone, 30mm
Flooring
Reclaimed oak, oiled
Lighting
Brass pendants, warm dim
Fittings
Unlacquered brass
How the job ran
Week 1
Strip out and make safe
Week 2
First fix: wiring, plumbing, plaster
Weeks 3–4
Cabinetry, worktop and tiling
Week 5
Snagging, clean and handover
Before and after
Drag the handle to compare.



