All projects
Kitchens
The Hartley kitchen
A cramped 1990s kitchen opened up into a bright room with cobalt cabinets and a stone island the whole family gathers around.
Location
Travis Heights, Austin
Timeline
7 weeks
Budget
$42,000
Finished
2026

The brief
Maya and Ben cooked for five in a kitchen built for two. The layout fought them, the cabinets were failing and the lighting was a single ceiling bulb.
What we did
We moved the sink under the window, built a stone island with seating for four and fitted cobalt lower cabinets with walnut tall units. New wiring, under-cabinet lighting and a proper extractor finished the job.
In their words
They kept the kitchen usable for us almost every day. Seven weeks later it felt like a different house.
Maya and Ben Hartley
Materials and finishes
Cabinetry
Hand-painted shaker, cobalt
Worktop
Honed limestone, 30mm
Flooring
Reclaimed oak, oiled
Lighting
Brass pendants, warm dim
Fittings
Unlacquered brass
How the job ran
Week 1
Strip out and make safe
Week 2
First fix: wiring, plumbing, plaster
Weeks 3–4
Cabinetry, worktop and tiling
Week 5
Snagging, clean and handover
Before and after
Drag the handle to compare.


